VICT have announced increases to their Infrastructure Surcharges and introduced two landside charges:-
Effective 1 July 2023:
Infrastructure Surcharge will be increased to all full containers received or delivered via road or rail.
Effective 1 June 2023:
VGM Weight Discrepancy Fee
This Charge will apply to all containers determined by the Pondus Stand to have a weight variance greater than 1 metric tonne within the documented VGM.
The fee is to ensure the correct weight of the container is documented for safe discharge and collection from the terminal by the nominated transport operator.
It is the shipper’s responsibility to ensure the correct weight of the container is documented prior to loaded/discharged.
Reefer Temperature Discrepancy Fee
This charge will apply on Reefer containers that have a Temperature variance greater than 3 degrees Celsius from the Temperature provided to the terminal on the PRA.
The fee is targeted to ensure Reefer are set at the correct Temperature prior gate in and minimise the temperature variation on Reefer cargoes.
It is the shipper’s responsibility to ensure the Reefer is set at the correct temperature.
If you have any questions, please reach out to your Customer team.
Comments
0 comments
Please sign in to leave a comment.